Set against the unmistakable silhouette of the Burj Al Arab, the Dubai Holding Headquarters is more than just an office-it’s a symbol of ambition, innovation, and Dubai’s relentless pursuit of excellence.

Since its move from Emirates Towers in 2017, this government-owned campus has been a blueprint for sustainable design and employee-centric spaces.

But when it came time to reimagine its nighttime presence, only a bold, intelligent lighting solution would suffice.

Enter ENTTEC-where pixel precision meets architectural artistry. In partnership with BMTC, ENTTEC transformed the headquarters’ long horizontal façade from static to spectacular, replacing outdated Neon Flex with a dynamic, pixel-controlled system.

The result? A living canvas that pulses with the spirit of Dubai Holding’s vision, adapting in real-time to reflect the company’s ever-evolving identity.

At the heart of this luminous transformation:

  • 10 x Pixelator Mini drive seamless, high-capacity pixel distribution.
  • 6 x S-Play SP-1 controllers orchestrate versatile, standalone playback for any occasion.
  • Rugged, IP-rated PLink Injectors keep data flowing reliably, no matter the distance.

Behind the scenes, ENTTEC delivered more than just hardware. Through tailored in-house training, BMTC’s engineers gained the expertise to navigate every challenge—from complex power layouts to fine-tuning pixel loops—ensuring a seamless installation from the ground up.

Now, as dusk settles over Umm Suqeim Road, the Dubai Holding Headquarters doesn’t just stand out-it shines as a beacon of innovation, a testament to how visionary lighting can elevate not just a building, but also exemplifies how strategic lighting solutions can elevate architectural landmarks across the UAE.

Set against the unmistakable silhouette of the Burj Al Arab, the Dubai Holding Headquarters is more than just an office-it’s a symbol of ambition, innovation, and Dubai’s relentless pursuit of excellence.

Since its move from Emirates Towers in 2017, this government-owned campus has been a blueprint for sustainable design and employee-centric spaces.

But when it came time to reimagine its nighttime presence, only a bold, intelligent lighting solution would suffice.

Enter ENTTEC-where pixel precision meets architectural artistry. In partnership with BMTC, ENTTEC transformed the headquarters’ long horizontal façade from static to spectacular, replacing outdated Neon Flex with a dynamic, pixel-controlled system.

The result? A living canvas that pulses with the spirit of Dubai Holding’s vision, adapting in real-time to reflect the company’s ever-evolving identity.

At the heart of this luminous transformation:

  • 10 x Pixelator Mini drive seamless, high-capacity pixel distribution.
  • 6 x S-Play SP-1 controllers orchestrate versatile, standalone playback for any occasion.
  • Rugged, IP-rated PLink Injectors keep data flowing reliably, no matter the distance.

Behind the scenes, ENTTEC delivered more than just hardware. Through tailored in-house training, BMTC’s engineers gained the expertise to navigate every challenge—from complex power layouts to fine-tuning pixel loops—ensuring a seamless installation from the ground up.

Now, as dusk settles over Umm Suqeim Road, the Dubai Holding Headquarters doesn’t just stand out-it shines as a beacon of innovation, a testament to how visionary lighting can elevate not just a building, but also exemplifies how strategic lighting solutions can elevate architectural landmarks across the UAE.